42-133-31392

WEISE JOE P.

EASTLAND County · District 7 · R R PRODUCTION 3 · FOSTER (MARBLE FALLS)

RRC Lookup

Permits

1

Max Depth

3,550 ft

First Permit

1978-03-27

Latest Activity

1978-03-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1978-05-20

Shut-In

Plugged

1988-05-04

!

EWA / Permit operator mismatch

Scheduling: R R PRODUCTION 3 ≠ Permit: TRINITY OIL & GAS CORP.

Resolved via: schedulingR R PRODUCTION 3

Operator History

originally filed by TRINITY OIL & GAS CORP. — asset transferred

Permit Applications (1)

#20860 A TRINITY OIL & GAS CORP.
received 1978-03-27

Well Details

Well Number
1
Max Depth
3,550 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1978-05-20

Operator

Location
CROSS PLAIN
P-5 Status
Y (filed 1992-04-01)
Total Permits
11

External Links

Live © 2026 Petrora