42-133-31675

Final Completion

LEWALLEN

EASTLAND County · District 7 · SMITH PIPE OF ABILENE · BLIND HOG (RANGER)

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1978-12-04

Latest Activity

1978-12-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-02-28

Shut-In

Plugged

2005-02-04

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: MEHAFFEY INVESTMENTS, INC. (reported 2003-10)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PALO PETROLEUM, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2005-02

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#37969 A PALO PETROLEUM, INC.
received 1978-12-04

Well Details

Well Number
2
Max Depth
3,500 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1979-02-28

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora