42-133-32085
Final CompletionCAREY UNIT
EASTLAND County · District 7 · SMITH PIPE OF ABILENE · MAGNUM (CONGL)
Permits
1
Max Depth
3,550 ft
First Permit
1979-11-19
Latest Activity
1979-11-19
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-12-31
Shut-In
—
Plugged
2005-02-15
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: AMES OIL (reported 2000-08)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TIDWELL, DON
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2005-03
Operator History
originally filed by TIDWELL, DON — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#64093 A TIDWELL, DON
received 1979-11-19
Well Details
- Well Number
- 1
- Max Depth
- 3,550 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1979-12-31
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf