42-133-32438

Final Completion

MASSENGILL

EASTLAND County · District 7 · HORN ENERGY · LOYCE (STRAWN)

RRC Lookup

Permits

1

Max Depth

2,000 ft

First Permit

1980-07-22

Latest Activity

1980-07-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-11-20

Shut-In

Plugged

2009-02-18

!

EWA / Permit operator mismatch

Scheduling: HORN ENERGY ≠ Permit: HAILEY OIL CO., INC.

Resolved via: schedulingHORN ENERGY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-02

Operator History

originally filed by HAILEY OIL CO., INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#87382 A HAILEY OIL CO., INC.
received 1980-07-22

Well Details

Well Number
1
Max Depth
2,000 ft
Drill Type
Vertical
County
EASTLAND
District
7
Operator
HORN ENERGY
Completed
1980-11-20

Operator

Location
EASTLAND
P-5 Status
Y (filed 2012-08-03)
Cum Oil (all leases)
7,459 bbl
Cum Gas (all leases)
130,854 mcf
Total Permits
9

External Links

Live © 2026 Petrora