Permits
1
Max Depth
4,300 ft
First Permit
1980-12-18
Latest Activity
1980-12-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-02-21
Shut-In
—
Plugged
2019-07-17
!
EWA / Permit operator mismatch
Scheduling: ENSTAR ENERGY INC. ≠ Permit: FIRST TEXAS PETROLEUM, INC.
Resolved via: scheduling → ENSTAR ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by FIRST TEXAS PETROLEUM, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#102699 A FIRST TEXAS PETROLEUM, INC.
received 1980-12-18
Well Details
- Well Number
- 6
- Max Depth
- 4,300 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- ENSTAR ENERGY INC.
- Completed
- 1981-02-21
Operator
- Name
- ENSTAR ENGY, INC
- Location
- ARLINGTON
- P-5 Status
- Y (filed 2023-04-06)
- Cum Oil (all leases)
- 61,662 bbl
- Cum Gas (all leases)
- 11,329 mcf
- Total Permits
- 1