42-133-33465

Final Completion

VERMILLION

EASTLAND County · District 7 · SMITH PIPE OF ABILENE · EASTLAND COUNTY REGULAR (GAS)

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1981-11-17

Latest Activity

1981-11-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-01-22

Shut-In

Plugged

2007-07-19

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WATSON, JOHNNIE A., INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2007-07

Operator History

originally filed by WATSON, JOHNNIE A., INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#140796 A WATSON, JOHNNIE A., INC.
received 1986-08-22
#140796 A WHITT, W. J.
received 1981-11-17

Well Details

Well Number
1
Max Depth
3,500 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1985-01-22

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora