42-133-33671

Final Completion

TERRELL C. E.

EASTLAND County · District 7 · SMITH PIPE OF ABILENE · NORTH RIDGE (DUFFER)

RRC Lookup

Permits

2

Max Depth

3,900 ft

First Permit

1982-02-02

Latest Activity

1995-04-11

Lifespan

13 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-04-07

Shut-In

Plugged

2013-06-28

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: NORTH RIDGE CORPORATION (reported 2010-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: NORTH RIDGE CORPORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by NORTH RIDGE CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#434475 A NORTH RIDGE CORPORATION
received 1995-04-03
#149599 A BRADFORD, ROBERT L.
received 1982-02-02

Well Details

Well Number
9
Max Depth
3,900 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1995-04-07

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora