42-133-35425
Final CompletionTANKERSLEY
EASTLAND County · District 7 · SMITH PIPE OF ABILENE · REB (MARBLE FALLS)
Permits
1
Max Depth
4,000 ft
First Permit
1983-10-17
Latest Activity
1983-10-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-10-19
Shut-In
—
Plugged
1997-04-24
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: RICHEY, RAY MANAGEMENT CO., INC. (reported 1993-11)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SNOW OIL CO.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1997-04
Operator History
originally filed by SNOW OIL CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#217257 A SNOW OIL CO.
received 1983-10-07
Well Details
- Well Number
- 2
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1983-10-19
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf