42-133-35670

Final Completion

RIDDLE UNIT 4

EASTLAND County · District 7 · STAR ONE ENERGY INC. · MARSAN (CONGL.)

RRC Lookup

Permits

1

Max Depth

3,400 ft

First Permit

1984-02-13

Latest Activity

1984-02-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-04-02

Shut-In

Plugged

2011-10-14

!

EWA / Permit operator mismatch

Scheduling: STAR ONE ENERGY INC. ≠ Permit: MORRISON ENERGY COMPANY

Resolved via: schedulingSTAR ONE ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2011-10

Operator History

originally filed by MORRISON ENERGY COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#229322 A MORRISON ENERGY COMPANY
received 1984-02-13

Well Details

Well Number
401
Max Depth
3,400 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1984-04-02

Operator

Location
FORT WORTH
P-5 Status
Y (filed 2012-03-09)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
589,881 mcf

External Links

Live © 2026 Petrora