42-133-35824
Final CompletionDURHAM-EAST
EASTLAND County · District 7 · SMITH PIPE OF ABILENE · REB (MARBLE FALLS)
Permits
1
Max Depth
4,000 ft
First Permit
1984-04-19
Latest Activity
1984-04-19
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-05-12
Shut-In
—
Plugged
1998-07-06
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: SNOW OIL CO.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-07
Operator History
originally filed by SNOW OIL CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#236068 A SNOW OIL CO.
received 1984-04-18
Well Details
- Well Number
- 1
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1984-05-12
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf