42-133-35970

Final Completion

SPEEGLE

EASTLAND County · District 7 · PETRO-STARR · EASTLAND COUNTY REGULAR

RRC Lookup

Permits

1

Max Depth

4,500 ft

First Permit

1984-07-03

Latest Activity

1984-07-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-04-10

Shut-In

Plugged

1990-05-25

!

EWA / Permit operator mismatch

Scheduling: PETRO-STARR ≠ Permit: EATON PETROLEUM, INC.

Resolved via: schedulingPETRO-STARR

Operator History

originally filed by EATON PETROLEUM, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#243964 A EATON PETROLEUM, INC.
received 1984-07-02

Well Details

Well Number
2
Max Depth
4,500 ft
Drill Type
Vertical
County
EASTLAND
District
7
Operator
PETRO-STARR
Completed
1985-04-10

Operator

Location
CISCO
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
96 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G
Total Permits
37

External Links

Live © 2026 Petrora