42-133-35971

Final Completion

PEEL-WHITE

EASTLAND County · District 7 · SMITH PIPE OF ABILENE · REB (MARBLE FALLS)

RRC Lookup

Permits

1

Max Depth

3,600 ft

First Permit

1984-07-03

Latest Activity

1984-07-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-11-08

Shut-In

Plugged

2008-05-02

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: MEHAFFEY INVESTMENTS, INC. (reported 2005-06)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: ROBERTSON, T. L. OPERATING CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#243966 A ROBERTSON, T. L. OPERATING CO.
received 1984-07-02

Well Details

Well Number
3
Max Depth
3,600 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1984-11-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora