42-133-36566
Final CompletionRICE J.A.
EASTLAND County · District 7 · SMITH PIPE OF ABILENE · ADAMS (DUFFER LOWER)
Permits
1
Max Depth
4,000 ft
First Permit
1985-07-26
Latest Activity
1985-07-26
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-08-27
Shut-In
—
Plugged
1998-05-20
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: RICHEY, RAY MANAGEMENT CO., INC. (reported 1997-02)
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RICHEY & COMPANY, INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2008-03
Operator History
originally filed by RICHEY & COMPANY, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
Well Details
- Well Number
- 1
- Max Depth
- 4,000 ft
- Drill Type
- Vertical
- County
- EASTLAND
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-08-27
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf