42-133-37465

Unperfed Completion

RENER

EASTLAND County · District 7 · S.U.E. COMPANY · S.U.E. (ELLENBURGER)

RRC Lookup

Permits

2

Max Depth

4,350 ft

First Permit

1990-07-10

Latest Activity

1995-03-21

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-08-17

Shut-In

Plugged

1990-11-17

!

EWA / Permit operator mismatch

Scheduling: S.U.E. COMPANY ≠ Permit: TEXAS UNITED GEOPRODUCTION, INC.

Resolved via: schedulingS.U.E. COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-04

Last Production

1998-03

Operator History

originally filed by TEXAS UNITED GEOPRODUCTION, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#433963 A TEXAS UNITED GEOPRODUCTION, INC.
received 1995-03-20
#375233 A FENNER, K. L., JR.
received 1990-07-06

Well Details

Well Number
1
Max Depth
4,350 ft
Drill Type
Vertical
County
EASTLAND
District
7
Completed
1990-08-17

Operator

Location
ABILENE
P-5 Status
Y (filed 1998-12-04)
Cum Oil (all leases)
14,932 bbl
Cum Gas (all leases)
— mcf
Total Permits
21

External Links

Live © 2026 Petrora