42-135-05777
Final CompletionT X L -O-
ECTOR County · District 8 · CAMBRIAN MANAGEMENT LTD. · TXL (SAN ANDRES)
Permits
1
Max Depth
4,512 ft
First Permit
1993-08-24
Latest Activity
1993-08-24
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1993-09-09
Shut-In
—
Plugged
—
!
EWA / Production operator mismatch
Scheduling: CAMBRIAN MANAGEMENT LTD. ≠ Production: BAKER OPERATING, INC. (reported 2025-12)
!
EWA / Permit operator mismatch
Scheduling: CAMBRIAN MANAGEMENT LTD. ≠ Permit: PHILLIPS PETROLEUM COMPANY
Resolved via: production → BAKER OPERATING, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#415190 A PHILLIPS PETROLEUM COMPANY
received 1993-08-20
Well Details
- Well Number
- 2
- Max Depth
- 4,512 ft
- Drill Type
- Vertical
- County
- ECTOR
- District
- 8
- Operator
- CAMBRIAN MANAGEMENT LTD.
- Completed
- 1993-09-09
Operator
- Location
- MCCAULLEY
- P-5 Status
- Y (filed 2025-04-04)
- Cum Oil (all leases)
- 3,819,696 bbl
- Cum Gas (all leases)
- 1,544,534 mcf
- Activities
- OPRS/O
- Total Permits
- 107