42-135-06103

SHUT IN

TXL B

ECTOR County · District 8 · PITTS ENERGY CO. · GOLDSMITH N. (SAN ANDRES CON.)

RRC Lookup

Permits

1

Max Depth

5,810 ft

First Permit

1993-04-12

Latest Activity

1993-04-12

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1993-06-05

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: PITTS ENERGY CO. ≠ Permit: TEXACO E & P INC.

Resolved via: schedulingPITTS ENERGY CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#410576 A TEXACO E & P INC.
received 1993-04-08

Well Details

Well Number
2
Max Depth
5,810 ft
Drill Type
Vertical
County
ECTOR
District
8
Completed
1993-06-05

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
8,672,439 bbl
Cum Gas (all leases)
9,880,122 mcf
Activities
OPRS/G, OPRS/O
Total Permits
216

External Links

Live © 2026 Petrora