42-135-06723

Final Completion

PARKS ROY -B- TG

ECTOR County · District 8 · ANADARKO PETROLEUM CORPORATION · DORA ROBERTS (PENNSYLVANIAN)

RRC Lookup

Permits

1

Max Depth

5,750 ft

First Permit

1979-01-16

Latest Activity

1979-01-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: ANADARKO PETROLEUM CORPORATION ≠ Production: COG OPERATING LLC (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: ANADARKO PETROLEUM CORPORATION ≠ Permit: ATLANTIC RICHFIELD CO.

Resolved via: productionCOG OPERATING LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#40930 A ATLANTIC RICHFIELD CO.
received 1979-01-16

Well Details

Well Number
19D
Max Depth
5,750 ft
Drill Type
Vertical
County
ECTOR
District
8

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
73,560,813 bbl
Cum Gas (all leases)
1,723,441,403 mcf
Total Permits
4,004

External Links

Live © 2026 Petrora