42-135-06731

Final Completion

PARKS ROY JR. EST. -C-

ECTOR County · District 8 · CHEVRON U. S. A. INC. · HEADLEE (ELLENBURGER)

RRC Lookup

Permits

1

Max Depth

13,345 ft

First Permit

1991-11-07

Latest Activity

1991-11-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2021-11-17

!

EWA / Permit operator mismatch

Scheduling: CHEVRON U. S. A. INC. ≠ Permit: GETTY OIL CO.

Resolved via: schedulingCHEVRON U. S. A. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by GETTY OIL CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#391782 A GETTY OIL CO.
received 1991-09-10

Well Details

Well Number
2904
Max Depth
13,345 ft
Drill Type
Vertical
County
ECTOR
District
8

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
622,347,311 bbl
Cum Gas (all leases)
4,191,207,826 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,225

External Links

Live © 2026 Petrora