42-135-07274

Final Completion

MILLARD D

ECTOR County · District 8 · PHILLIPS PETROLEUM COMPANY · PENWELL (QUEEN)

RRC Lookup

Permits

1

Max Depth

3,370 ft

First Permit

1997-10-22

Latest Activity

1997-10-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-12-03

Shut-In

Plugged

2002-09-27

!

EWA / Production operator mismatch

Scheduling: PHILLIPS PETROLEUM COMPANY ≠ Production: RING ENERGY, INC. (reported 2025-12)

Resolved via: productionRING ENERGY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#468982 A PHILLIPS PETROLEUM COMPANY
received 1997-10-17

Well Details

Well Number
8
Max Depth
3,370 ft
Drill Type
Vertical
County
ECTOR
District
8
Completed
1997-12-03

Operator

Location
HOUSTON
P-5 Status
Y (filed 2003-06-20)
Cum Oil (all leases)
41,085,875 bbl
Cum Gas (all leases)
1,158,849,972 mcf
Total Permits
2,544

External Links

Live © 2026 Petrora