42-135-07274
Final CompletionMILLARD D
ECTOR County · District 8 · PHILLIPS PETROLEUM COMPANY · PENWELL (QUEEN)
Permits
1
Max Depth
3,370 ft
First Permit
1997-10-22
Latest Activity
1997-10-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1997-12-03
Shut-In
—
Plugged
2002-09-27
!
EWA / Production operator mismatch
Scheduling: PHILLIPS PETROLEUM COMPANY ≠ Production: RING ENERGY, INC. (reported 2025-12)
Resolved via: production → RING ENERGY, INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#468982 A PHILLIPS PETROLEUM COMPANY
received 1997-10-17
Well Details
- Well Number
- 8
- Max Depth
- 3,370 ft
- Drill Type
- Vertical
- County
- ECTOR
- District
- 8
- Operator
- PHILLIPS PETROLEUM COMPANY
- Completed
- 1997-12-03
Operator
- Name
- PHILLIPS PETRO CO
- Location
- HOUSTON
- P-5 Status
- Y (filed 2003-06-20)
- Cum Oil (all leases)
- 41,085,875 bbl
- Cum Gas (all leases)
- 1,158,849,972 mcf
- Total Permits
- 2,544