42-135-33090
Final CompletionHEADLEE DEVONIAN UNIT
ECTOR County · District 8 · CHEVRON U. S. A. INC. · HEADLEE (DEVONIAN)
Permits
1
Max Depth
12,375 ft
First Permit
1978-12-06
Latest Activity
1978-12-06
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-03-21
Shut-In
—
Plugged
2020-05-07
!
EWA / Permit operator mismatch
Scheduling: CHEVRON U. S. A. INC. ≠ Permit: GETTY OIL CO.
Resolved via: scheduling → CHEVRON U. S. A. INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2020-05
Operator History
originally filed by GETTY OIL CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#38918 A GETTY OIL CO.
received 1978-12-06
Well Details
- Well Number
- 36-10
- Max Depth
- 12,375 ft
- Drill Type
- Vertical
- County
- ECTOR
- District
- 8
- Operator
- CHEVRON U. S. A. INC.
- Completed
- 1979-03-21
Operator
- Name
- TEXACO E & P INC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-11-04)
- Cum Oil (all leases)
- 622,347,311 bbl
- Cum Gas (all leases)
- 4,191,207,826 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 9,225