42-135-34794

Final Completion

GOLDSMITH C. A. ETAL

ECTOR County · District 8 · HILCORP ENERGY COMPANY · LAWSON (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

6,350 ft

First Permit

1985-02-22

Latest Activity

1989-09-19

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-10-19

Shut-In

Plugged

1992-07-24

!

EWA / Permit operator mismatch

Scheduling: HILCORP ENERGY COMPANY ≠ Permit: CHEVRON U. S. A. INC.

Resolved via: productionHILCORP ENERGY COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#363000 A CHEVRON U. S. A. INC.
received 1989-08-21
#267508 A GULF OIL CORP.
received 1985-02-21

Well Details

Well Number
1559
Max Depth
6,350 ft
Drill Type
Vertical
County
ECTOR
District
8
Completed
1989-10-19

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-01-13)
Cum Oil (all leases)
72,015,602 bbl
Cum Gas (all leases)
1,737,102,151 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
3,390

External Links

Live © 2026 Petrora