42-135-40861
PRODUCINGSTEAKLEY 5
ECTOR County · District 8 · WAYLANDER LLC · GOLDSMITH (CLEAR FORK)
Permits
2
Max Depth
6,100 ft
First Permit
2011-03-16
Latest Activity
2020-10-29
Lifespan
10 yrs
Regulatory Status
Schedule
ON SCHEDULE
Completion
2021-05-12
Shut-In
—
Plugged
—
P-5 Org Status: Delinquent
!
EWA / Permit operator mismatch
Scheduling: WAYLANDER LLC ≠ Permit: PRIDE ENERGY COMPANY
Resolved via: production → WAYLANDER LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2010-12
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#865839 A PRIDE ENERGY COMPANY
received 2020-10-28
#711661 A PRIDE ENERGY COMPANY
received 2011-03-07
Lat 31.848814
Lon -102.617228
Well Details
- Well Number
- 3
- Max Depth
- 6,100 ft
- Drill Type
- Vertical
- County
- ECTOR
- District
- 8
- Operator
- WAYLANDER LLC
- Completed
- 2021-05-12
Operator
- Name
- WAYLANDER LLC
- Location
- PLANO
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 8,228 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/G, OPRS/O