42-137-30968

NELSON MORRIS RIDGLEY

EDWARDS County · District 1 · SMITH PIPE OF ABILENE · PAN-GIL RANCH (CANYON)

RRC Lookup

Permits

2

Max Depth

2,800 ft

First Permit

1987-10-20

Latest Activity

1987-10-20

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-01-19

Shut-In

Plugged

1998-04-01

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: BROWN, J. K. INC. (reported 1996-11)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: JOHNSON OPERATING, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-03

Operator History

Chain of Custody

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#336625 A JOHNSON OPERATING, INC.
received 1988-04-29
#336625 X JOHNSON OPERATING, INC.
received 1988-04-28
#336625 A JOHNSON OPERATING, INC.
received 1987-09-29

Well Details

Well Number
4014
Max Depth
2,800 ft
Drill Type
Vertical
County
EDWARDS
District
1
Completed
1988-01-19

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora