42-137-31070

Final Completion

DISMUKES

EDWARDS County · District 1 · SMITH PIPE OF ABILENE · ROCKSPRINGS W. (CANYON)

RRC Lookup

Permits

1

Max Depth

6,000 ft

First Permit

1991-05-03

Latest Activity

1991-05-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-05-25

Shut-In

Plugged

1998-04-17

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: A A PRODUCTION INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#387480 A A A PRODUCTION INC.
received 1991-05-03

Well Details

Well Number
1001
Max Depth
6,000 ft
Drill Type
Vertical
County
EDWARDS
District
1
Completed
1991-05-25

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora