42-151-30024

Final Completion

JACKSON W. H.

FISHER County · District 7 · GENERAL CRUDE OIL CO. · ROUND TOP (PALO PINTO REEF)

RRC Lookup

Permits

3

Max Depth

5,001 ft

First Permit

1979-02-01

Latest Activity

1987-06-03

Lifespan

8 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1970-01-12

Shut-In

Plugged

1990-06-05

!

EWA / Production operator mismatch

Scheduling: GENERAL CRUDE OIL CO. ≠ Production: L.C.S. PRODUCTION COMPANY (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: GENERAL CRUDE OIL CO. ≠ Permit: GBG OPERATING CORP.

Resolved via: productionL.C.S. PRODUCTION COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#330947 A LARANCE ENGINEERING COMPANY
received 1988-06-01
#330947 A GBG OPERATING CORP.
received 1987-06-01
#42311 A GENERAL CRUDE OIL CO.
received 1979-02-01

Well Details

Well Number
6
Max Depth
5,001 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1970-01-12

Operator

Location
UNKNOWN
P-5 Status
Y (filed 2023-05-05)
Total Permits
107

External Links

Live © 2026 Petrora