42-151-31031

Final Completion

FIELDS A

FISHER County · District 7 · ROSS ENGINEERING INC. · NOODLE NW. (CANYON SD. 4100)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1979-12-19

Latest Activity

1979-12-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-09-19

Shut-In

Plugged

1987-07-07

!

EWA / Permit operator mismatch

Scheduling: ROSS ENGINEERING INC. ≠ Permit: STROUBE & REIFF

Resolved via: schedulingROSS ENGINEERING INC.

Operator History

originally filed by STROUBE & REIFF — asset transferred

Permit Applications (1)

#67290 A STROUBE & REIFF
received 1979-12-19

Well Details

Well Number
1A
Max Depth
5,000 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1980-09-19

Operator

Location
ABILENE
P-5 Status
Y (filed 2017-10-13)
Cum Oil (all leases)
108,377 bbl
Cum Gas (all leases)
— mcf
Total Permits
5

External Links

Live © 2026 Petrora