42-151-31076

Final Completion

WAGSTAFF J.P.

FISHER County · District 7 · SMITH PIPE OF ABILENE · RAVEN CREEK (CANYON SAND)

RRC Lookup

Permits

1

Max Depth

4,300 ft

First Permit

1979-10-04

Latest Activity

1979-10-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-12-27

Shut-In

Plugged

1998-09-25

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: U.S. ENERGY, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1998-10

Operator History

originally filed by U.S. ENERGY, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#59744 A U.S. ENERGY, INC.
received 1979-10-04

Well Details

Well Number
2
Max Depth
4,300 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1979-12-27

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora