42-151-31335

Final Completion

BOWDEN BILLY C.

FISHER County · District 7 · TDC ENGINEERING INC. · SYLVESTER (FLIPPEN)

RRC Lookup

Permits

1

Max Depth

3,500 ft

First Permit

1981-07-28

Latest Activity

1981-07-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-09-18

Shut-In

Plugged

1990-02-02

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#127462 A TDC ENGINEERING, INC.
received 1981-07-28

Well Details

Well Number
3
Max Depth
3,500 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1981-09-18

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
519,590 bbl
Cum Gas (all leases)
5,474,807 mcf
Activities
OPRS/O
Total Permits
224

External Links

Live © 2026 Petrora