42-151-31514

Final Completion

NEEPER

FISHER County · District 7 · SMITH PIPE OF ABILENE · JONISUE BOWDEN (CANYON)

RRC Lookup

Permits

1

Max Depth

5,100 ft

First Permit

1982-05-21

Latest Activity

1982-05-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-01-10

Shut-In

Plugged

2013-04-22

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WILBURN, J. A.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Operator History

originally filed by WILBURN, J. A. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#161395 A WILBURN, J. A.
received 1982-05-21

Well Details

Well Number
2
Max Depth
5,100 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1983-01-10

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora