42-151-31514
Final CompletionNEEPER
FISHER County · District 7 · SMITH PIPE OF ABILENE · JONISUE BOWDEN (CANYON)
Permits
1
Max Depth
5,100 ft
First Permit
1982-05-21
Latest Activity
1982-05-21
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-01-10
Shut-In
—
Plugged
2013-04-22
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: WILBURN, J. A.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by WILBURN, J. A. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#161395 A WILBURN, J. A.
received 1982-05-21
Well Details
- Well Number
- 2
- Max Depth
- 5,100 ft
- Drill Type
- Vertical
- County
- FISHER
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1983-01-10
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf