42-151-31817
Final CompletionDAVIS BEN M. OIL UNIT
FISHER County · District 7 · SMITH PIPE OF ABILENE · SANDY HILL (STRAWN LIME)
Permits
1
Max Depth
6,200 ft
First Permit
1984-05-03
Latest Activity
1984-05-03
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-09-13
Shut-In
—
Plugged
1997-04-18
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: BRECK OPERATING CORP. (reported 1996-04)
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BRECK OPERATING CORP.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1997-08
Operator History
originally filed by BRECK OPERATING CORP. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (2)
Well Details
- Well Number
- 2
- Max Depth
- 6,200 ft
- Drill Type
- Vertical
- County
- FISHER
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1984-09-13
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf