42-151-31987

Final Completion

SMITH

FISHER County · District 7 · SWEETWATER PRODUCTION INC. · JONISUE BOWDEN (CANYON)

RRC Lookup

Permits

1

Max Depth

4,980 ft

First Permit

1985-06-17

Latest Activity

1985-06-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1986-02-28

Shut-In

Plugged

2023-05-22

!

EWA / Permit operator mismatch

Scheduling: SWEETWATER PRODUCTION INC. ≠ Permit: WILBURN, J. A.

Resolved via: schedulingSWEETWATER PRODUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2023-05

Operator History

originally filed by WILBURN, J. A. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#277910 A WILBURN, J. A.
received 1985-06-14

Well Details

Well Number
2
Max Depth
4,980 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1986-02-28

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
34,917 bbl
Cum Gas (all leases)
1,186,057 mcf
Activities
OPRS/G, OPRS/O
Total Permits
4

External Links

Live © 2026 Petrora