42-151-32087
Final CompletionTOUCHSTONE-MABERRY
FISHER County · District 7 · AMERICAN CASCADE ENERGY INC. · RAVEN CREEK (CANYON SAND)
Permits
1
Max Depth
5,700 ft
First Permit
1986-03-26
Latest Activity
1986-03-26
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1986-04-08
Shut-In
—
Plugged
2002-12-20
!
EWA / Permit operator mismatch
Scheduling: AMERICAN CASCADE ENERGY INC. ≠ Permit: HPC OPERATING, INC.
Resolved via: scheduling → AMERICAN CASCADE ENERGY INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
originally filed by HPC OPERATING, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (2)
#300312 A HPC OPERATING, INC.
received 1986-05-08
#300312 A SOJOURNER DRLG. CORP.
received 1986-03-26
Well Details
- Well Number
- 1
- Max Depth
- 5,700 ft
- Drill Type
- Vertical
- County
- FISHER
- District
- 7
- Operator
- AMERICAN CASCADE ENERGY INC.
- Completed
- 1986-04-08
Operator
- Location
- BARKER
- P-5 Status
- Y (filed 2025-04-04)
- Cum Oil (all leases)
- 56,801 bbl
- Cum Gas (all leases)
- 839,263 mcf
- Activities
- OPRS/G
- Total Permits
- 74