42-151-32172

Final Completion

FOWLER 195

FISHER County · District 7 · CALTO OPERATING COMPANY INC. · ROUGH DRAW (NOODLE CREEK)

RRC Lookup

Permits

1

Max Depth

4,000 ft

First Permit

1987-11-23

Latest Activity

1987-11-23

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1991-05-03

Shut-In

Plugged

1993-08-14

!

EWA / Permit operator mismatch

Scheduling: CALTO OPERATING COMPANY INC. ≠ Permit: LIMARK CORPORATION

Resolved via: schedulingCALTO OPERATING COMPANY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-09

Operator History

originally filed by LIMARK CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#339284 A LIMARK CORPORATION
received 1987-11-23

Well Details

Well Number
1
Max Depth
4,000 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1991-05-03

Operator

Location
DALLAS
P-5 Status
Y (filed 2004-03-05)
Cum Oil (all leases)
16,501 bbl
Cum Gas (all leases)
5,547,655 mcf
Total Permits
22

External Links

Live © 2026 Petrora