42-151-32200

Final Completion

SMITH BOBBY

FISHER County · District 7 · SMITH PIPE OF ABILENE · CALIFORNIA CREEK (CANYON SAND)

RRC Lookup

Permits

1

Max Depth

4,999 ft

First Permit

1988-10-25

Latest Activity

1988-10-25

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-12-20

Shut-In

Plugged

1993-06-25

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: RICHEY, RAY MANAGEMENT CO., INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-07

Operator History

originally filed by RICHEY, RAY MANAGEMENT CO., INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#352613 A RICHEY, RAY MANAGEMENT CO., INC.
received 1988-10-24

Well Details

Well Number
1
Max Depth
4,999 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1988-12-20

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora