42-151-32396

Final Completion

HARVEY

FISHER County · District 7 · SMITH PIPE OF ABILENE · ALYSSE (CANYON)

RRC Lookup

Permits

1

Max Depth

6,200 ft

First Permit

1994-03-17

Latest Activity

1994-03-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1994-05-07

Shut-In

Plugged

2002-08-01

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: SINCLAIR OIL CORPORATION (reported 1997-12)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: UNION PACIFIC RESOURCES COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1994-05

Last Production

2002-09

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#422078 A UNION PACIFIC RESOURCES COMPANY
received 1994-03-16

Well Details

Well Number
2
Max Depth
6,200 ft
Drill Type
Vertical
County
FISHER
District
7
Completed
1994-05-07

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora