42-151-32513
Plug Dry Hole (P&A)FERGUSON
FISHER County · District 7 · PARDUE (FLIPPEN)
Permits
1
Max Depth
4,400 ft
First Permit
1997-09-09
Latest Activity
1997-09-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
—
Shut-In
—
Plugged
1997-09-23
!
EWA / Permit operator mismatch
Scheduling: AMBRIT ENERGY CORP ≠ Permit: AMBRIT ENERGY CORP.
Resolved via: scheduling → AMBRIT ENERGY CORP
Operator History
originally filed by AMBRIT ENERGY CORP. — asset transferred
Permit Applications (1)
#467346 A AMBRIT ENERGY CORP.
received 1997-09-09
Well Details
- Well Number
- 1
- Max Depth
- 4,400 ft
- Drill Type
- Vertical
- County
- FISHER
- District
- 7
- Operator
- —