Permits
1
Max Depth
6,100 ft
First Permit
1991-10-21
Latest Activity
1991-10-21
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1992-02-13
Shut-In
—
Plugged
1994-05-21
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-08
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#391630 A STALEY OPERATING CO.
received 1991-09-04
Well Details
- Well Number
- 1
- Max Depth
- 6,100 ft
- Drill Type
- Vertical
- County
- FLOYD
- District
- 8
- Operator
- STALEY OPERATING CO.
- Completed
- 1992-02-13
Operator
- Name
- STALEY OPER CO
- Location
- MIDLAND
- P-5 Status
- Y (filed 2024-08-02)
- Cum Oil (all leases)
- 342,661 bbl
- Cum Gas (all leases)
- 15,825,303 mcf
- Total Permits
- 133