42-157-31399

Final Completion

COOLEY DENTON

FORT BEND County · District 3 · PHILLIPS PETROLEUM COMPANY · COOLEY (13 200)

RRC Lookup

Permits

1

Max Depth

15,000 ft

First Permit

1982-11-17

Latest Activity

1982-11-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-05-17

Shut-In

Plugged

1994-04-13

!

EWA / Permit operator mismatch

Scheduling: PHILLIPS PETROLEUM COMPANY ≠ Permit: AMINOIL USA INC.

Resolved via: schedulingPHILLIPS PETROLEUM COMPANY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-04

Operator History

originally filed by AMINOIL USA INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#177487 A AMINOIL USA INC.
received 1982-11-17

Well Details

Well Number
1
Max Depth
15,000 ft
Drill Type
Vertical
County
FORT BEND
District
3
Completed
1983-05-17

Operator

Location
HOUSTON
P-5 Status
Y (filed 2003-06-20)
Cum Oil (all leases)
41,085,875 bbl
Cum Gas (all leases)
1,158,849,972 mcf
Total Permits
2,544

External Links

Live © 2026 Petrora