42-157-32335

Final Completion

GEORGE RANCH AU-1 GAS UNIT

FORT BEND County · District 3 · BOPCO L.P. · SMITHERS LAKE (YEGUA AU-1)

RRC Lookup

Permits

2

Max Depth

12,000 ft

First Permit

2005-02-23

Latest Activity

2009-12-07

Lifespan

5 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2005-06-29

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: BOPCO L.P. ≠ Production: ROY JACKSON ENERGY OPERATING, LL (reported 2025-04)

Resolved via: schedulingBOPCO L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2005-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#688229 A BOPCO, L.P.
received 2009-12-04
#557893 A BASS ENTERPRISES PRODUCTION CO.
received 2005-02-17

Well Details

Well Number
15
Max Depth
12,000 ft
Drill Type
Vertical
County
FORT BEND
District
3
Operator
BOPCO L.P.
Completed
2005-06-29

Operator

Location
MIDLAND
P-5 Status
Y (filed 2024-09-06)
Cum Oil (all leases)
6,242,844 bbl
Cum Gas (all leases)
82,225,431 mcf
Total Permits
41

External Links

Live © 2026 Petrora