42-159-00543

Final Completion

NEW HOPE UNIT

FRANKLIN County · District 6 · J.P. OIL COMPANY INC. · NEW HOPE (ELLEDGE)

RRC Lookup

Permits

1

Max Depth

8,300 ft

First Permit

2018-03-28

Latest Activity

2018-03-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2018-07-02

Shut-In

Plugged

2022-02-07

!

EWA / Permit operator mismatch

Scheduling: J.P. OIL COMPANY INC. ≠ Permit: XTO ENERGY INC.

Resolved via: productionJ.P. OIL COMPANY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#837992 A XTO ENERGY INC.
received 2018-03-26
Lat 33.034059
Lon -95.203189

Well Details

Well Number
672
Max Depth
8,300 ft
Drill Type
Vertical
County
FRANKLIN
District
6
Completed
2018-07-02

Operator

Location
LAFAYETTE
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
1,969,000 bbl
Cum Gas (all leases)
2,006,825 mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora