42-159-00550

PRODUCING

NEW HOPE UNIT

FRANKLIN County · District 6 · J.P. OIL COMPANY INC. · NEW HOPE (BACON LIME)

RRC Lookup

Permits

1

Max Depth

8,230 ft

First Permit

1977-11-15

Latest Activity

1977-11-15

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

1946-04-01

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Permit operator mismatch

Scheduling: J.P. OIL COMPANY INC. ≠ Permit: GETTY OIL CO.

Resolved via: productionJ.P. OIL COMPANY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#9606 A GETTY OIL CO.
received 1977-11-15

Well Details

Well Number
41
Max Depth
8,230 ft
Drill Type
Vertical
County
FRANKLIN
District
6
Completed
1946-04-01

Operator

Location
LAFAYETTE
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
1,969,000 bbl
Cum Gas (all leases)
2,006,825 mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora