42-159-30421

Final Completion

SMITH TRUST

FRANKLIN County · District 6 · COX & COX PRODUCTION CO. · TULLY SW (PALUXY)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1986-10-17

Latest Activity

1986-10-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1987-01-23

Shut-In

Plugged

2021-10-18

!

EWA / Production operator mismatch

Scheduling: COX & COX PRODUCTION CO. ≠ Production: EAST TEXAS PRODUCTION MGT. INC (reported 1996-08)

!

EWA / Permit operator mismatch

Scheduling: COX & COX PRODUCTION CO. ≠ Permit: CLAY, A. CARROLL

Resolved via: schedulingCOX & COX PRODUCTION CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#321948 A CLAY, A. CARROLL
received 1986-10-16

Well Details

Well Number
1
Max Depth
5,000 ft
Drill Type
Vertical
County
FRANKLIN
District
6
Completed
1987-01-23

Operator

Location
DONNA
P-5 Status
Y (filed 2025-04-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G

External Links

Live © 2026 Petrora