42-159-30472

Final Completion

NEW HOPE DEEP UNIT

FRANKLIN County · District 6 · XTO ENERGY INC. · NEW HOPE (TRAVIS PEAK)

RRC Lookup

Permits

2

Max Depth

14,000 ft

First Permit

1990-04-20

Latest Activity

2015-02-25

Lifespan

25 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2018-06-15

Shut-In

Plugged

2023-06-29

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2023-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#804073 A XTO ENERGY INC.
received 2015-02-24
#372164 A TEXACO PRODUCING INC.
received 1990-04-13

Well Details

Well Number
47D
Max Depth
14,000 ft
Drill Type
Vertical
County
FRANKLIN
District
6
Completed
2018-06-15

Operator

Location
SPRING
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
755,132,920 bbl
Cum Gas (all leases)
11,012,998,973 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
16,136

External Links

Live © 2026 Petrora