42-161-30110
Final CompletionALDERMAN
FREESTONE County · District 5 · PINNERGY LTD. · HOLLMAN (7777)
Permits
1
Max Depth
9,844 ft
First Permit
1983-06-13
Latest Activity
1983-06-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2004-10-18
Shut-In
—
Plugged
2021-12-14
!
EWA / Production operator mismatch
Scheduling: PINNERGY LTD. ≠ Production: BISHOP PETROLEUM INC. (reported 1996-09)
!
EWA / Permit operator mismatch
Scheduling: PINNERGY LTD. ≠ Permit: BISHOP PETROLEUM INC.
Resolved via: scheduling → PINNERGY LTD.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2021-11
Operator History
originally filed by BISHOP PETROLEUM INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#198088 A BISHOP PETROLEUM INC.
received 1983-06-13
Well Details
- Well Number
- 1
- Max Depth
- 9,844 ft
- Drill Type
- Vertical
- County
- FREESTONE
- District
- 5
- Operator
- PINNERGY LTD.
- Completed
- 2004-10-18
Operator
- Name
- PINNERGY, LTD
- Location
- AUSTIN
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/G, OPRS/O
- Total Permits
- 21