42-163-30285

Final Completion

TALLEY J.W.

FRIO County · District 1 · LEGACY CORPORATION THE · PEARSALL (AUSTIN CHALK)

RRC Lookup

Permits

1

Max Depth

6,045 ft

First Permit

1989-05-16

Latest Activity

1989-05-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-07-15

Shut-In

Plugged

1997-06-19

!

EWA / Permit operator mismatch

Scheduling: LEGACY CORPORATION THE ≠ Permit: YAHOLA OPERATING CO.

Resolved via: schedulingLEGACY CORPORATION THE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-07

Operator History

originally filed by YAHOLA OPERATING CO. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#359029 A YAHOLA OPERATING CO.
received 1989-05-08

Well Details

Well Number
3
Max Depth
6,045 ft
Drill Type
Vertical
County
FRIO
District
1
Completed
1989-07-15

Operator

Location
CEDAR PARK
P-5 Status
Y (filed 2004-08-06)
Cum Oil (all leases)
9,305 bbl
Cum Gas (all leases)
3,605,003 mcf
Total Permits
62

External Links

Live © 2026 Petrora