42-163-30463

Final Completion

MCCLANAHAN M.R.

FRIO County · District 1 · R.C.L.J. CONSTRUCTION INC. · PEARSALL (AUSTIN CHALK)

RRC Lookup

Permits

1

Max Depth

7,315 ft

First Permit

1980-10-07

Latest Activity

1980-10-07

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1976-12-17

Shut-In

Plugged

1994-11-01

!

EWA / Permit operator mismatch

Scheduling: R.C.L.J. CONSTRUCTION INC. ≠ Permit: CLEMCO

Resolved via: schedulingR.C.L.J. CONSTRUCTION INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-11

Operator History

originally filed by CLEMCO — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#94937 A CLEMCO
received 1980-10-07

Well Details

Well Number
1 D
Max Depth
7,315 ft
Drill Type
Vertical
County
FRIO
District
1
Completed
1976-12-17

Operator

Location
BIG WELLS
P-5 Status
Y (filed 2005-06-10)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora