42-163-30965
STACY H. F.
FRIO County · District 1 · TEXAS SOUTHERN ENERGY CORP. · PEARSALL (AUSTIN CHALK)
Permits
1
Max Depth
6,314 ft
First Permit
1977-06-20
Latest Activity
1977-06-20
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1977-06-14
Shut-In
—
Plugged
1994-05-27
!
EWA / Permit operator mismatch
Scheduling: TEXAS SOUTHERN ENERGY CORP. ≠ Permit: PAMALE PETROLEUM CO.
Resolved via: scheduling → TEXAS SOUTHERN ENERGY CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2003-08
Operator History
originally filed by PAMALE PETROLEUM CO. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#1089 A PAMALE PETROLEUM CO.
received 1977-06-20
Well Details
- Well Number
- 3
- Max Depth
- 6,314 ft
- Drill Type
- Vertical
- County
- FRIO
- District
- 1
- Operator
- TEXAS SOUTHERN ENERGY CORP.
- Completed
- 1977-06-14
Operator
- Location
- SAN ANTONIO
- P-5 Status
- Y (filed 1994-08-05)
- Cum Oil (all leases)
- — bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 4