42-163-31765

Final Completion

JONES NEWT #4

FRIO County · District 1 · MESCALERO ENERGY INC. · PEARSALL (AUSTIN CHALK)

RRC Lookup

Permits

2

Max Depth

7,400 ft

First Permit

1978-05-03

Latest Activity

1980-03-28

Lifespan

2 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-05-14

Shut-In

Plugged

2012-06-08

!

EWA / Production operator mismatch

Scheduling: MESCALERO ENERGY INC. ≠ Production: FRIO OIL & GAS, LTD. (reported 2025-12)

!

EWA / Permit operator mismatch

Scheduling: MESCALERO ENERGY INC. ≠ Permit: HUGHEY, W. R., OPERATING CO.

Resolved via: productionFRIO OIL & GAS, LTD.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#76454 A HUGHEY, W. R., OPERATING CO.
received 1980-03-28
#23487 A HUGHEY, W. R., OPERATING CO.
received 1978-05-03

Well Details

Well Number
4
Max Depth
7,400 ft
Drill Type
Vertical
County
FRIO
District
1
Completed
1980-05-14

Operator

Location
SAN ANTONIO
P-5 Status
Y (filed 2001-03-22)
Cum Oil (all leases)
133,925 bbl
Cum Gas (all leases)
409,835 mcf
Total Permits
11

External Links

Live © 2026 Petrora