42-163-32284

Final Completion

NIXON & DILLARD -B-

FRIO County · District 1 · BAXTER KELLY H. · FAIR RAY

RRC Lookup

Permits

1

Max Depth

5,100 ft

First Permit

1984-02-01

Latest Activity

1984-02-01

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-04-01

Shut-In

Plugged

1999-09-14

!

EWA / Permit operator mismatch

Scheduling: BAXTER KELLY H. ≠ Permit: FAIR ENERGY

Resolved via: schedulingBAXTER KELLY H.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#228088 A FAIR ENERGY
received 1984-02-01

Well Details

Well Number
5
Max Depth
5,100 ft
Drill Type
Vertical
County
FRIO
District
1
Completed
1984-04-01

Operator

Location
AUSTIN
P-5 Status
Y (filed 2001-05-11)
Cum Oil (all leases)
97,609 bbl
Cum Gas (all leases)
547,670 mcf
Total Permits
14

External Links

Live © 2026 Petrora