42-163-32747

Final Completion Horizontal

STEWART-MENEFEE UNIT IV

FRIO County · District 1 · CALTEX ENERGY CO. · PEARSALL (AUSTIN CHALK)

RRC Lookup

Permits

1

Max Depth

7,200 ft

First Permit

1990-06-11

Latest Activity

1990-06-11

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1990-09-17

Shut-In

Plugged

2009-01-08

!

EWA / Permit operator mismatch

Scheduling: CALTEX ENERGY CO. ≠ Permit: HYDROEX, INC.

Resolved via: schedulingCALTEX ENERGY CO.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#374312 A HYDROEX, INC.
received 1990-06-11

Well Details

Well Number
1
Max Depth
7,200 ft
Drill Type
Horizontal
County
FRIO
District
1
Completed
1990-09-17

Operator

Location
LULING
P-5 Status
Y (filed 2011-01-07)
Cum Oil (all leases)
156,182 bbl
Cum Gas (all leases)
— mcf

External Links

Live © 2026 Petrora